Blog

Each year, Sydney Water removes 500 tonnes of wipes from the wastewater network at a cost of $8 million. Clean-outs reportedly occur on a regular basis, and require specialized equipment and manual labor at a costly expense.
The Olympic Dam mine in South Australia, 550 km NNW of Adelaide was facing an issue. With winter approaching, there was a real risk to the amount of tonnage that could be mined if their bores weren't dewatered in time. Allied Pumps provided quick bespoke solution to their challenge.
Showing 105 to 107 of 107 (22 Pages)