Request a quote

Case Studies

Project Focus – West Africa

May 26 2017

Allied Pumps is pleased to take part in an exciting West African project for the supply of Twin 185kW VSD driven, pontoon mounted, vertical turbine pumps, with DN250 headworks, containerised switch room and generators.

The supply of this system was challenging in the respect that Allied Pumps pulled together equipment from manufacturers in all corners of the world, with the generators coming from Europe, the pumps from Eastern Europe, instrumentation from the United States and the control room and bore headworks design, assembled and tested from scratch at Allied Pumps’ Canning Vale facility.

The equipment is being dispatched to a remote mine site in West Africa where it will be installed into a disused mining pit full of water to feed raw water to the mining process.

See a design video of the headworks here.

Contact the Allied Pumps Team

Contact us to learn about how we can help you with your pump needs.

CALL US NOW EMAIL US