Request a quote

Case Studies

Bickley Booster Pump Station

March 22 2017
In October 1992 Allied Pumps were approached by Peter Scott to solve a low-pressure challenge in the Orange Grove area. The client required a pump duty of 8.0L/sec @ 37m boost.

In 1993 a pump system comprising of dual pumps operating on a variable speed control was supplied as a complete package with base, pipework, valves, control system and pressure vessel.

24 years later and most of the pumpset is original. The system is still in action – a testament to the quality and longevity that comes with our products.

Would you like to know more about our water pressure system products? Please contact the team at Allied Pumps today

Contact the Allied Pumps Team

Contact us to learn about how we can help you with your pump needs.

CALL US NOW EMAIL US